TRF371109EVM

Mfr. #: TRF371109EVM
メーカー: Texas Instruments
説明: RF Development Tools TRF371109 Eval Mod
ライフサイクル: メーカー新製品
データシート: TRF371109EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF371109EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Modulators / Demodulators type. Frequency range: 300 MHz to 1.7 GHz 5 V operating supply voltage range Dimensions of 333.2 mm x 345.9 mm x 28.6 mm Texas Instruments is a trusted brand for quality electronics Interface Type: USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. RF Development Tools product type 1 of 100 Development Tools as subcategory

TRF371109EVM Image

TRF371109EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF371109EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: RF Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: Modulators / Demodulators
  • Tool Is For Evaluation Of: TRF371109
  • Frequency: 300 MHz to 1.7 GHz
  • Operating Supply Voltage: 5 V
  • Description/Function: Used to test the performance of the TRF371135 direct quadrature demodulator device
  • Dimensions: 333.2 mm x 345.9 mm x 28.6 mm
  • Series: TRF371109
  • Brand: Texas Instruments
  • Interface Type: USB
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: RF Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TRF371109EVM

TRF371109EVM Specifications

TRF371109EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Modulators / Demodulators.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 300 MHz to 1.7 GHz.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 333.2 mm x 345.9 mm x 28.6 mm

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed RF Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top