TSC2200EVM

Mfr. #: TSC2200EVM
メーカー: Texas Instruments
説明: Touch Sensor Development Tools Touch Screen Contr Eval Mod
ライフサイクル: メーカー新製品
データシート: TSC2200EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2200EVM Overview

This product is manufactured by Texas Instruments. 2.7 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Touch Sensor Development Tools product type 1 of 100 Development Tools as subcategory

TSC2200EVM Image

TSC2200EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2200EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Touch Sensor Development Tools
  • RoHS: N
  • Tool Is For Evaluation Of: TSC2200
  • Operating Supply Voltage: 2.7 V
  • Brand: Texas Instruments
  • Product Type: Touch Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSC2200EVM

TSC2200EVM Specifications

TSC2200EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 2.7 V

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Touch Sensor Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top