TSW14DL3200EVM

Mfr. #: TSW14DL3200EVM
メーカー: Texas Instruments
説明: Data Conversion IC Development Tools TSW14DL3200 EVM
ライフサイクル: メーカー新製品
データシート: TSW14DL3200EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW14DL3200EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the ADC and DAC type. 10 V to 14 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: USB Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

TSW14DL3200EVM Image

TSW14DL3200EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW14DL3200EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N/A
  • Product: Evaluation Modules
  • Type: ADC and DAC
  • Tool Is For Evaluation Of: TSW14DL3200
  • Operating Supply Voltage: 10 V to 14 V
  • Description/Function: High-speed data LVDS capture and pattern generator card
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Current: 3 A
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSW14DL3200EVM

TSW14DL3200EVM Specifications

TSW14DL3200EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC and DAC.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 10 V to 14 V

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is USB.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Data Conversion IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top