TUSB211PICO-EVM

Mfr. #: TUSB211PICO-EVM
メーカー: Texas Instruments
説明: Interface Development Tools USB 2.0 SIGNAL CONDITIONER ADD-ON BOARD.
ライフサイクル: メーカー新製品
データシート: TUSB211PICO-EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TUSB211PICO-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB 2.0 Signal Conditioner type. Texas Instruments is a trusted brand for quality electronics Compatible with TUSB211. 3.3 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

TUSB211PICO-EVM Image

TUSB211PICO-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TUSB211PICO-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: USB 2.0 Signal Conditioner
  • Tool Is For Evaluation Of: TUSB211
  • Description/Function: High-speed signal conditioner evaluation module
  • Series: TUSB211
  • Brand: Texas Instruments
  • For Use With: TUSB211
  • Operating Supply Voltage: 3.3 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TUSB211PICO-EVM

TUSB211PICO-EVM Specifications

TUSB211PICO-EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is USB 2.0 Signal Conditioner.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TUSB211

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Interface Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

15 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top