TUSB322EVM

Mfr. #: TUSB322EVM
メーカー: Texas Instruments
説明: Interface Development Tools TUSB322EVM
ライフサイクル: メーカー新製品
データシート: TUSB322EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TUSB322EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB Type-C 1.1 type. Texas Instruments is a trusted brand for quality electronics Compatible with TUSB322. 5.5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory The product's USB Type-C is Blue Gecko.

TUSB322EVM Image

TUSB322EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TUSB322EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: USB Type-C 1.1
  • Tool Is For Evaluation Of: TUSB322
  • Series: TUSB322
  • Brand: Texas Instruments
  • For Use With: TUSB322
  • Operating Supply Voltage: 5.5 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: USB Type-C

TUSB322EVM

TUSB322EVM Specifications

TUSB322EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is USB Type-C 1.1.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TUSB322

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5.5 V

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is USB Type-C.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top