TUSB7320EVM

Mfr. #: TUSB7320EVM
メーカー: Texas Instruments
説明: Interface Development Tools 2-port SuperSpd USB xHCI PCIe Card Ref
ライフサイクル: メーカー新製品
データシート: TUSB7320EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TUSB7320EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB type. Dimensions of 4.38 in x 2.57 in Texas Instruments is a trusted brand for quality electronics Interface Type: USB 5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

TUSB7320EVM Image

TUSB7320EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TUSB7320EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: USB
  • Tool Is For Evaluation Of: TUSB7320
  • Description/Function: TUSB7320EVM board is a free-standing reference design for a two-port PCIe-based SuperSpeed USB (USB 3.0) Extensible Host Controller (xHCI)
  • Dimensions: 4.38 in x 2.57 in
  • Series: TUSB7320
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Voltage: 5 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TUSB7320EVM

TUSB7320EVM Specifications

TUSB7320EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed USB

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 4.38 in x 2.57 in

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Interface Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top