TVP9900EVM

Mfr. #: TVP9900EVM
メーカー: Texas Instruments
説明: Video IC Development Tools TVP9900 Eval Mod
ライフサイクル: メーカー新製品
データシート: TVP9900EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TVP9900EVM Overview

This product is manufactured by Texas Instruments. 5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Video IC Development Tools product type 1 of 100 Development Tools as subcategory

TVP9900EVM Image

TVP9900EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TVP9900EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Video IC Development Tools
  • RoHS: N
  • Tool Is For Evaluation Of: TVP9900
  • Operating Supply Voltage: 5 V
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Product Type: Video IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TVP9900EVM

TVP9900EVM Specifications

TVP9900EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Video IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top