UCC2540EVM-054

Mfr. #: UCC2540EVM-054
メーカー: Texas Instruments
説明: Power Management IC Development Tools UCC2540-054 Eval Mod
ライフサイクル: メーカー新製品
データシート: UCC2540EVM-054 データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC2540EVM-054 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Primary/Secondary Side Controllers type. 24 V Input Voltage Output Voltage is 1.5 V, 3.3 V Dimensions of 152.4 mm x 127 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

UCC2540EVM-054 Image

UCC2540EVM-054

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC2540EVM-054 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Primary/Secondary Side Controllers
  • Tool Is For Evaluation Of: UCC2540
  • Input Voltage: 24 V
  • Output Voltage: 1.5 V, 3.3 V
  • Dimensions: 152.4 mm x 127 mm
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

UCC2540EVM-054

UCC2540EVM-054 Specifications

UCC2540EVM-054 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Primary/Secondary Side Controllers.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 24 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.5 V, 3.3 V

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 152.4 mm x 127 mm.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top