| Mfr. #: | UCC28880EVM-616 |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | Power Management IC Development Tools UCC0880 Eval Mod |
| ライフサイクル: | メーカー新製品 |
| データシート: | UCC28880EVM-616 データシート |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the AC/DC Converters type. 115 VAC/230 VAC Input Voltage Output Voltage is 12.6 V Dimensions of 5 in x 3.5 in x 0.75 in Output current: 100 mA Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 40 C. The minimum operating temperature of this product is 0 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.230158 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC28880EVM-616 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is AC/DC Converters.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 115 VAC/230 VAC
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 12.6 V
A: Is the cutoff frequency of the product Dimensions?
Q: Yes, the product's Dimensions is indeed 5 in x 3.5 in x 0.75 in
A: At what frequency does the Output Current?
Q: The product Output Current is 100 mA.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 40 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is 0 C.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.230158 oz.