USB-CTM-MINIDK-EVM

Mfr. #: USB-CTM-MINIDK-EVM
メーカー: Texas Instruments
説明: Interface Development Tools USB-CTM-MINIDK-EVM
ライフサイクル: メーカー新製品
データシート: USB-CTM-MINIDK-EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
USB-CTM-MINIDK-EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB Type-C 1.1 type. Dimensions of 2 in x 4 in Texas Instruments is a trusted brand for quality electronics Interface Type: USB 5 V, 20 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory The product's USB Type-C is Blue Gecko.

USB-CTM-MINIDK-EVM Image

USB-CTM-MINIDK-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

USB-CTM-MINIDK-EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: USB Type-C 1.1
  • Tool Is For Evaluation Of: TUSB321, TUSB8041
  • Description/Function: USB Type-C and Power Delivery mini-dock evaluation module
  • Dimensions: 2 in x 4 in
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Voltage: 5 V, 20 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: USB Type-C

USB-CTM-MINIDK-EVM

USB-CTM-MINIDK-EVM Specifications

USB-CTM-MINIDK-EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed USB Type-C 1.1

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 2 in x 4 in.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V, 20 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Interface Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Tradename?

    Q: The product Tradename is USB Type-C.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
Top