ADC3442EVM

Mfr. #: ADC3442EVM
メーカー: Texas Instruments
説明: EVAL MODULE ADC3442
ライフサイクル: メーカー新製品
データシート: ADC3442EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3442EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product's 50M. Data-Interface: LVDS - Serial 14 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADC3442 This product operates at a 1.8 V supply voltage for reliable performance. This product is an ADC3442 evaluation module. This tool is designed for the ADC3442. Serial LVDS interface type

ADC3442EVM Image

ADC3442EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3442EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 50M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 4
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3442
  • Power-Typ-Conditions 228mW @ 50MSPS
  • Operating-Supply-Voltage 1.8 V
  • Description-Function ADC3442 evaluation module
  • Tool-Is-For-Evaluation-Of ADC3442
  • Interface-Type Serial LVDS

ADC3442EVM

ADC3442EVM Specifications

ADC3442EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 50M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is LVDS - Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 14.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 4.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADC3442

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is ADC3442 evaluation module.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADC3442

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed Serial LVDS

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$57.20
$57.20
10
$54.34
$543.35
100
$51.48
$5 147.55
500
$48.62
$24 307.90
1000
$45.76
$45 756.00
Top