ADC3443EVM

Mfr. #: ADC3443EVM
メーカー: Texas Instruments
説明: EVAL MODULE ADC3443
ライフサイクル: メーカー新製品
データシート: ADC3443EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3443EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product This product's 80M. Data-Interface: LVDS - Serial 14 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADC3443

ADC3443EVM Image

ADC3443EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3443EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Packaging Bulk
  • Sampling-Rate-Per-Second 80M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 4
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3443
  • Power-Typ-Conditions 288mW @ 80MSPS

ADC3443EVM

ADC3443EVM Specifications

ADC3443EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 80M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed LVDS - Serial

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 14.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 4.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADC3443.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$438.81
$438.81
10
$416.86
$4 168.65
100
$394.92
$39 492.47
500
$372.98
$186 492.20
1000
$351.04
$351 044.20
Top