Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Sensitivity: - Interface: SPI, USB Voltage Supply Range: - Temperature Sensing range of - Included item: 2 Boards, Cables. IC package type: ADS1118 This product operates at a 2 V to 5.5 V supply voltage for reliable performance. This tool is designed for the ADS1118. USB interface type Our product measures 50.8 mm x 25.4 mm in dimensions for compact and convenient use.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1118EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: At what frequency does the Type?
Q: The product Type is ADC.
A: What is the Sensitivity of the product?
Q: The Sensitivity of the product is -.
A: Is the cutoff frequency of the product Interface?
Q: Yes, the product's Interface is indeed SPI, USB
A: At what frequency does the Voltage-Supply?
Q: The product Voltage-Supply is -.
A: At what frequency does the Sensor-Type?
Q: The product Sensor-Type is Temperature.
A: What is the Sensing-Range of the product?
Q: The Sensing-Range of the product is -.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is 2 Boards, Cables.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is ADS1118.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 2 V to 5.5 V.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is ADS1118.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is USB.
A: At what frequency does the Dimensions?
Q: The product Dimensions is 50.8 mm x 25.4 mm.