ADS1293EVM

Mfr. #: ADS1293EVM
メーカー: Texas Instruments
説明: EVALUATION MODULE FOR ADS1293
ライフサイクル: メーカー新製品
データシート: ADS1293EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1293EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS1293 amplifier. The Interface, Analog Front End (AFE) for ECG, EKG is the Main-Purpose. Primary-Attributes: - IC package type: ADS1293 This tool is designed for the ADS1293.

ADS1293EVM Image

ADS1293EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1293EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS1293
  • Main-Purpose Interface, Analog Front End (AFE) for ECG, EKG
  • Primary-Attributes -
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part ADS1293
  • Tool-Is-For-Evaluation-Of ADS1293

ADS1293EVM

ADS1293EVM Specifications

ADS1293EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed ADS1293

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Analog Front End (AFE) for ECG, EKG.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS1293.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS1293

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$148.50
$148.50
10
$141.08
$1 410.75
100
$133.65
$13 365.00
500
$126.22
$63 112.50
1000
$118.80
$118 800.00
Top