ADS4245EVM

Mfr. #: ADS4245EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR ADS4245
ライフサイクル: メーカー新製品
データシート: ADS4245EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4245EVM Overview

Product belongs to the - series. This product's 125M. Data-Interface: CMOS, LVDS, Serial, Parallel 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS4246

ADS4245EVM Image

ADS4245EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4245EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 125M
  • Data-Interface CMOS, LVDS, Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4246
  • Power-Typ-Conditions -

ADS4245EVM

ADS4245EVM Specifications

ADS4245EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 125M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is CMOS, LVDS, Serial, Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS4246.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$346.20
$346.20
10
$328.89
$3 288.90
100
$311.58
$31 158.00
500
$294.27
$147 135.00
1000
$276.96
$276 960.00
Top