ADS4449EVM

Mfr. #: ADS4449EVM
メーカー: Texas Instruments
説明: ADS4449EVM EVALUATION MODULE
ライフサイクル: メーカー新製品
データシート: ADS4449EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4449EVM Overview

Product belongs to the ADS4449 series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS4449 amplifier. This product's 250M. Data-Interface: DDR LVDS 14 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADS4449 This product operates at a 6 V supply voltage for reliable performance. This product is an Evaluation provides a platform for a quad-channel 14 bit analog-to-digital converter. This tool is designed for the ADS4449. SPI USB interface type

ADS4449EVM Image

ADS4449EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4449EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series ADS4449
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS4449
  • Sampling-Rate-Per-Second 250M
  • Data-Interface DDR LVDS
  • Number-of-Bits 14
  • Number-of-A-D-Converters 4
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4449
  • Power-Typ-Conditions 1.47W @ 250MSPS
  • Operating-Supply-Voltage 6 V
  • Description-Function Evaluation provides a platform for a quad-channel 14 bit analog-to-digital converter
  • Tool-Is-For-Evaluation-Of ADS4449
  • Interface-Type SPI USB

ADS4449EVM

ADS4449EVM Specifications

ADS4449EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is ADS4449.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is ADS4449.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 250M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is DDR LVDS.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 4

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS4449.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 6 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Evaluation provides a platform for a quad-channel 14 bit analog-to-digital converter.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS4449.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$693.57
$693.57
10
$658.89
$6 588.91
100
$624.21
$62 421.30
500
$589.53
$294 767.25
1000
$554.86
$554 856.00
Top