ADS5263EVM

Mfr. #: ADS5263EVM
メーカー: Texas Instruments
説明: MODULE EVAL FOR ADS5263
ライフサイクル: メーカー新製品
データシート: ADS5263EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5263EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 100M. Data-Interface: Serial 16 bits 4 units Input range: 4 Vpp Included item: Board. IC package type: ADS5263 This product operates at a 6 V supply voltage for reliable performance. 1.5 A is 92 nA. USB interface type

ADS5263EVM Image

ADS5263EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5263EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 100M
  • Data-Interface Serial
  • Number-of-Bits 16
  • Number-of-A-D-Converters 4
  • Input-Range 4 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5263
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 6 V
  • Operating-Supply-Current 1.5 A
  • Interface-Type USB

ADS5263EVM

ADS5263EVM Specifications

ADS5263EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 100M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 4

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 4 Vpp

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS5263

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 6 V.

  • A: Is the cutoff frequency of the product Operating-Supply-Current?

    Q: Yes, the product's Operating-Supply-Current is indeed 1.5 A

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$346.20
$346.20
10
$328.89
$3 288.90
100
$311.58
$31 158.00
500
$294.27
$147 135.00
1000
$276.96
$276 960.00
Top