ADS5272EVM

Mfr. #: ADS5272EVM
メーカー: Texas Instruments
説明: MODULE EVAL FOR ADS5272
ライフサイクル: メーカー新製品
データシート: ADS5272EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5272EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product This product's 65M. Data-Interface: Serial 12 bits 8 units Input range: 2.2 Vpp Included item: Board, Cable. IC package type: ADS5272 This product operates at a 1.8 V to 3.3 V supply voltage for reliable performance. This tool is designed for the ADS5272.

ADS5272EVM Image

ADS5272EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5272EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 65M
  • Data-Interface Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 8
  • Input-Range 2.2 Vpp
  • Supplied-Contents Board, Cable
  • Utilized-IC-Part ADS5272
  • Power-Typ-Conditions 983mS @ 65MSPS
  • Operating-Supply-Voltage 1.8 V to 3.3 V
  • Tool-Is-For-Evaluation-Of ADS5272

ADS5272EVM

ADS5272EVM Specifications

ADS5272EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 65M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Serial

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 8

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2.2 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board, Cable

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS5272.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS5272

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$318.69
$318.69
10
$302.76
$3 027.56
100
$286.82
$28 682.10
500
$270.89
$135 443.25
1000
$254.95
$254 952.00
Top