ADS5281EVM

Mfr. #: ADS5281EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR ADS5281
ライフサイクル: メーカー新製品
データシート: ADS5281EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5281EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 50M. Data-Interface: Serial 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS5281 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS5281. SMA interface type

ADS5281EVM Image

ADS5281EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5281EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category IC Chips
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 50M
  • Data-Interface Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5281
  • Power-Typ-Conditions 77mW @ 65MSPS
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS5281
  • Interface-Type SMA

ADS5281EVM

ADS5281EVM Specifications

ADS5281EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 50M

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Serial

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS5281.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS5281.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$57.46
$57.46
10
$54.59
$545.92
100
$51.72
$5 171.85
500
$48.85
$24 422.65
1000
$45.97
$45 972.00
Top