| Mfr. #: | ADS5282EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVAL MODULE FOR ADS5282 |
| ライフサイクル: | メーカー新製品 |
| データシート: | ADS5282EVM データシート |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 65M. Data-Interface: Serial 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS5282 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS5282. SMA interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5282EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 65M.
A: At what frequency does the Data-Interface?
Q: The product Data-Interface is Serial.
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 12.
A: Is the cutoff frequency of the product Number-of-A-D-Converters?
Q: Yes, the product's Number-of-A-D-Converters is indeed 2
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 2 Vpp.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed ADS5282
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 1.8 V to 5 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS5282
A: At what frequency does the Interface-Type?
Q: The product Interface-Type is SMA.