ADS5404EVM

Mfr. #: ADS5404EVM
メーカー: Texas Instruments
説明: ADS5404EVM EVALUATION MODULE
ライフサイクル: メーカー新製品
データシート: ADS5404EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5404EVM Overview

Product belongs to the ADS5404 series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS540x ADS54T0x amplifier. This product's 500M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS5404 This product operates at a 5 V supply voltage for reliable performance. This product is an Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS. This tool is designed for the ADS540x ADS54T0x. SPI USB interface type

ADS5404EVM Image

ADS5404EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5404EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series ADS5404
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS540x ADS54T0x
  • Sampling-Rate-Per-Second 500M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5404
  • Power-Typ-Conditions 1.84W @ 500MSPS
  • Operating-Supply-Voltage 5 V
  • Description-Function Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS
  • Tool-Is-For-Evaluation-Of ADS540x ADS54T0x
  • Interface-Type SPI USB

ADS5404EVM

ADS5404EVM Specifications

ADS5404EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is ADS5404.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is ADS540x ADS54T0x.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 500M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed DDR LVDS

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 1 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS5404

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS540x ADS54T0x.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$95.90
$95.90
10
$91.10
$911.00
100
$86.31
$8 630.55
500
$81.51
$40 755.40
1000
$76.72
$76 716.00
Top