ADS5409EVM

Mfr. #: ADS5409EVM
メーカー: Texas Instruments
説明: MODULE EVAL FOR ADS5409
ライフサイクル: メーカー新製品
データシート: ADS5409EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5409EVM Overview

Product belongs to the ADS5409 series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS540x amplifier. This product's 900M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS5409 This product operates at a 5 V supply voltage for reliable performance. This product is an ADS5409 - 12 Bit 900M Samples per Second Analog to Digital Converter (ADC) Evaluation Board. This tool is designed for the ADS540x. GUI interface type

ADS5409EVM Image

ADS5409EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5409EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series ADS5409
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS540x
  • Sampling-Rate-Per-Second 900M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5409
  • Power-Typ-Conditions 2.27W @ 900MSPS
  • Operating-Supply-Voltage 5 V
  • Description-Function ADS5409 - 12 Bit 900M Samples per Second Analog to Digital Converter (ADC) Evaluation Board
  • Tool-Is-For-Evaluation-Of ADS540x
  • Interface-Type GUI

ADS5409EVM

ADS5409EVM Specifications

ADS5409EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is ADS5409.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is ADS540x.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 900M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is DDR LVDS.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 1 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS5409.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is ADS5409 - 12 Bit 900M Samples per Second Analog to Digital Converter (ADC) Evaluation Board.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS540x

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is GUI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$748.50
$748.50
10
$711.08
$7 110.75
100
$673.65
$67 365.00
500
$636.22
$318 112.50
1000
$598.80
$598 800.00
Top