| Mfr. #: | ADS5527EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | ADS5527EVM |
| ライフサイクル: | メーカー新製品 |
| データシート: | ADS5527EVM データシート |


Product belongs to the - series. This product's 210M. Data-Interface: Serial, Parallel 12 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS5527

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5527EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 210M.
A: At what frequency does the Data-Interface?
Q: The product Data-Interface is Serial, Parallel.
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 12.
A: At what frequency does the Number-of-A-D-Converters?
Q: The product Number-of-A-D-Converters is 1.
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 2 Vpp.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS5527.