| Mfr. #: | ADS5547EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | ADS5547EVM |
| ライフサイクル: | メーカー新製品 |
| データシート: | ADS5547EVM データシート |


Product belongs to the - series. This product's 210M. Data-Interface: Serial, Parallel 14 bits 1 units Input range: 1 ~ 2 Vpp Included item: Board. IC package type: ADS5547

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5547EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Sampling-Rate-Per-Second?
Q: The product Sampling-Rate-Per-Second is 210M.
A: At what frequency does the Data-Interface?
Q: The product Data-Interface is Serial, Parallel.
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 14.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 1.
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 1 ~ 2 Vpp.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS5547.