ADS5560EVM

Mfr. #: ADS5560EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR ADS5560
ライフサイクル: メーカー新製品
データシート: ADS5560EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5560EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 40M. Data-Interface: Serial, Parallel 16 bits 1 units Input range: 3.56 Vpp Included item: Board. IC package type: ADS5560 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. SMA SPI interface type

ADS5560EVM Image

ADS5560EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5560EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 40M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 3.56 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5560
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Interface-Type SMA SPI

ADS5560EVM

ADS5560EVM Specifications

ADS5560EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 40M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial, Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 3.56 Vpp

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS5560.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V to 5 V.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$346.20
$346.20
10
$328.89
$3 288.90
100
$311.58
$31 158.00
500
$294.27
$147 135.00
1000
$276.96
$276 960.00
Top