ADS6223EVM

Mfr. #: ADS6223EVM
メーカー: Texas Instruments
説明: ADS6223EVM
ライフサイクル: メーカー新製品
データシート: ADS6223EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS6223EVM Overview

Product belongs to the - series. This product's 80M. Data-Interface: Serial, Parallel 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS6223

ADS6223EVM Image

ADS6223EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6223EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 80M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS6223
  • Power-Typ-Conditions 350mW @ 80MSPS

ADS6223EVM

ADS6223EVM Specifications

ADS6223EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 80M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Serial, Parallel

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS6223.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$336.02
$336.02
10
$319.21
$3 192.14
100
$302.41
$30 241.35
500
$285.61
$142 806.40
1000
$268.81
$268 812.00
Top