ADS7826EVM

Mfr. #: ADS7826EVM
メーカー: Texas Instruments
説明: EVALUATION MODULE FOR ADS7826
ライフサイクル: メーカー新製品
データシート: ADS7826EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7826EVM Overview

Product belongs to the microPOWER series. This product's 200k. Data-Interface: SPI 10 bits 1 units Input range: 0 ~ VREF Included item: Board. IC package type: ADS7826

ADS7826EVM Image

ADS7826EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7826EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Sampling-Rate-Per-Second 200k
  • Data-Interface SPI
  • Number-of-Bits 10
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7826
  • Power-Typ-Conditions -

ADS7826EVM

ADS7826EVM Specifications

ADS7826EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed microPOWER

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 200k.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is SPI.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 10

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ VREF.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS7826.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$0.00
$0.00
10
$0.00
$0.00
100
$0.00
$0.00
500
$0.00
$0.00
1000
$0.00
$0.00
Top