ADS7834EVM

Mfr. #: ADS7834EVM
メーカー: Texas Instruments
説明: EVAL MOD FOR ADS7834
ライフサイクル: メーカー新製品
データシート: ADS7834EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7834EVM Overview

Product belongs to the - series. This product's 500k. Data-Interface: Serial 12 bits 1 units Input range: 0 ~ VREF Included item: Board. IC package type: ADS7834

ADS7834EVM Image

ADS7834EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7834EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 500k
  • Data-Interface Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7834
  • Power-Typ-Conditions -

ADS7834EVM

ADS7834EVM Specifications

ADS7834EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 500k

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ VREF.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS7834

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$0.00
$0.00
10
$0.00
$0.00
100
$0.00
$0.00
500
$0.00
$0.00
1000
$0.00
$0.00
Top