| Mfr. #: | ADS7845EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | MODULE EVAL FOR ADS7845 |
| ライフサイクル: | メーカー新製品 |
| データシート: | ADS7845EVM データシート |


Product belongs to the - series. This product is categorized as Evaluation Boards The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 5-Wire Resistive Touch Screen Controller, Serial Interface, 12-Bit ADC IC package type: ADS7845 This tool is designed for the ADS7845. I2C SPI interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7845EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Interface, Touch Screen Controller.
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is 5-Wire Resistive Touch Screen Controller, Serial Interface, 12-Bit ADC.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is ADS7845.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS7845
A: Is the cutoff frequency of the product Interface-Type?
Q: Yes, the product's Interface-Type is indeed I2C SPI