ADS7863EVM

Mfr. #: ADS7863EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR ADS7863
ライフサイクル: メーカー新製品
データシート: ADS7863EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7863EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 2M. Data-Interface: Serial 12 bits 2 units Input range: ±VREF Included item: Board. IC package type: ADS7863 This product operates at a 2.7 V to 3.6 V supply voltage for reliable performance. This tool is designed for the ADS7863. USB interface type

ADS7863EVM Image

ADS7863EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7863EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 2M
  • Data-Interface Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range ±VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7863
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 2.7 V to 3.6 V
  • Tool-Is-For-Evaluation-Of ADS7863
  • Interface-Type USB

ADS7863EVM

ADS7863EVM Specifications

ADS7863EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 2M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Serial

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is ±VREF.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS7863

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.7 V to 3.6 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS7863.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$86.85
$86.85
10
$82.51
$825.08
100
$78.16
$7 816.50
500
$73.82
$36 911.25
1000
$69.48
$69 480.00
Top