ADS7868EVM

Mfr. #: ADS7868EVM
メーカー: Texas Instruments
説明: MODULE EVAL FOR ADS7868
ライフサイクル: メーカー新製品
データシート: ADS7868EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7868EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 200k. Data-Interface: Serial 8 bits 1 units Input range: 0 ~ 3.6 V Included item: Board. IC package type: ADS7868 This product operates at a 1.2 V to 3.6 V supply voltage for reliable performance. This tool is designed for the ADS7868.

ADS7868EVM Image

ADS7868EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7868EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 200k
  • Data-Interface Serial
  • Number-of-Bits 8
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 3.6 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7868
  • Power-Typ-Conditions 1.39mW @ 200kSPS
  • Operating-Supply-Voltage 1.2 V to 3.6 V
  • Tool-Is-For-Evaluation-Of ADS7868

ADS7868EVM

ADS7868EVM Specifications

ADS7868EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 200k.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Serial

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 8.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 0 ~ 3.6 V

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS7868.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.2 V to 3.6 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS7868

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top