ADS7924EVM

Mfr. #: ADS7924EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR ADS7924
ライフサイクル: メーカー新製品
データシート: ADS7924EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7924EVM Overview

Product belongs to the microPOWER series. This product is categorized as Evaluation Boards Type: ADC This product's 100k. Data-Interface: I2C, Serial 12 bits 1 units Input range: 0 ~ Vdd Included item: Board. IC package type: ADS7924 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS792. I2C interface type

ADS7924EVM Image

ADS7924EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7924EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 100k
  • Data-Interface I2C, Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ Vdd
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7924
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS792
  • Interface-Type I2C

ADS7924EVM

ADS7924EVM Specifications

ADS7924EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is microPOWER.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 100k

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is I2C, Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ Vdd.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS7924

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS792.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed I2C

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$86.85
$86.85
10
$82.51
$825.08
100
$78.16
$7 816.50
500
$73.82
$36 911.25
1000
$69.48
$69 480.00
Top