AFE5801EVM

Mfr. #: AFE5801EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR AFE5801
ライフサイクル: メーカー新製品
データシート: AFE5801EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5801EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Variable Gain Amplifiers This product is designed TSW1250EVM amplifier. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 8 Channel LVDS Outputs IC package type: AFE5801 This product operates at a 5 V supply voltage for reliable performance. This product is an 8-Channel Variable Gain Amplifier. This tool is designed for the AFE5801. SPI USB interface type

AFE5801EVM Image

AFE5801EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5801EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Variable Gain Amplifiers
  • For-Use-With TSW1250EVM
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 8 Channel LVDS Outputs
  • Embedded No
  • Utilized-IC-Part AFE5801
  • Operating-Supply-Voltage 5 V
  • Description-Function 8-Channel Variable Gain Amplifier
  • Tool-Is-For-Evaluation-Of AFE5801
  • Interface-Type SPI USB

AFE5801EVM

AFE5801EVM Specifications

AFE5801EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Variable Gain Amplifiers.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is TSW1250EVM.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, Analog Front End (AFE).

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 8 Channel LVDS Outputs.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is AFE5801.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is 8-Channel Variable Gain Amplifier.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is AFE5801.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$346.20
$346.20
10
$328.89
$3 288.90
100
$311.58
$31 158.00
500
$294.27
$147 135.00
1000
$276.96
$276 960.00
Top