AMPQUICKKIT-EVM

Mfr. #: AMPQUICKKIT-EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR AMPQUICKKIT
ライフサイクル: メーカー新製品
データシート: AMPQUICKKIT-EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMPQUICKKIT-EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product Operational temperature range: - Output-Type: Single-Ended Voltage supply range: - The - The -. Current-Output-Channel is - The amplifier is of General Purpose type. Included item: Board, Samples. IC package type: OPA170, OPA171, OPA172, OPA313, OPA314, OPA316 Board type: Bare (Unpopulated). The product has 1 - Single channel per IC.

AMPQUICKKIT-EVM Image

AMPQUICKKIT-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMPQUICKKIT-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Packaging Bulk
  • Operating-Temperature -
  • Output-Type Single-Ended
  • Voltage-Supply-Single-Dual -
  • -3db-Bandwidth -
  • Slew-Rate -
  • Current-Output-Channel -
  • Amplifier-Type General Purpose
  • Supplied-Contents Board, Samples
  • Utilized-IC-Part OPA170, OPA171, OPA172, OPA313, OPA314, OPA316
  • Board-Type Bare (Unpopulated)
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC -

AMPQUICKKIT-EVM

AMPQUICKKIT-EVM Specifications

AMPQUICKKIT-EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is Single-Ended.

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed -

  • A: What is the -3db-Bandwidth of the product?

    Q: The -3db-Bandwidth of the product is -.

  • A: What is the Slew-Rate of the product?

    Q: The Slew-Rate of the product is -.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is -.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is General Purpose.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board, Samples.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed OPA170, OPA171, OPA172, OPA313, OPA314, OPA316

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Bare (Unpopulated)

  • A: Is the cutoff frequency of the product Channels-per-IC?

    Q: Yes, the product's Channels-per-IC is indeed 1 - Single

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$43.50
$43.50
10
$41.32
$413.25
100
$39.15
$3 915.00
500
$36.98
$18 487.50
1000
$34.80
$34 800.00
Top