BQ2000EVM

Mfr. #: BQ2000EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR BQ2000
ライフサイクル: メーカー新製品
データシート: BQ2000EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ2000EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Battery Management The Power Management, Battery Charger is the Main-Purpose. Primary-Attributes: 1 ~ 4 Cell- Li-Ion, 1 ~ 10 Cell- NiCd/NiMH IC package type: BQ2000 This tool is designed for the BQ2000 BQ2000T. Our product measures 70 mm x 45.7 mm in dimensions for compact and convenient use. Input Voltage Range: 10 V to 25 V

BQ2000EVM Image

BQ2000EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ2000EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Battery Management
  • Main-Purpose Power Management, Battery Charger
  • Primary-Attributes 1 ~ 4 Cell- Li-Ion, 1 ~ 10 Cell- NiCd/NiMH
  • Embedded No
  • Utilized-IC-Part BQ2000
  • Tool-Is-For-Evaluation-Of BQ2000 BQ2000T
  • Dimensions 70 mm x 45.7 mm
  • Input-Voltage 10 V to 25 V

BQ2000EVM

BQ2000EVM Specifications

BQ2000EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Battery Management.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Battery Charger

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 1 ~ 4 Cell- Li-Ion, 1 ~ 10 Cell- NiCd/NiMH

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed BQ2000

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed BQ2000 BQ2000T

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 70 mm x 45.7 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 10 V to 25 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top