| Mfr. #: | BUF08630EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVAL MODULE FOR BUF08630 |
| ライフサイクル: | メーカー新製品 |
| データシート: | BUF08630EVM データシート |


Product belongs to the - series. This product is categorized as Development Tools The Video, Gamma Buffer and VCOM Calibrator is the Main-Purpose. Primary-Attributes: Gamma Correction for TFT-LCD Panels IC package type: BUF08630 This product operates at a 9 V to 20 V supply voltage for reliable performance. This product is an Evaluation Module. This tool is designed for the BUF08630.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BUF08630EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Development Tools
A: Is the cutoff frequency of the product Main-Purpose?
Q: Yes, the product's Main-Purpose is indeed Video, Gamma Buffer and VCOM Calibrator
A: Is the cutoff frequency of the product Primary-Attributes?
Q: Yes, the product's Primary-Attributes is indeed Gamma Correction for TFT-LCD Panels
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is BUF08630.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 9 V to 20 V.
A: Is the cutoff frequency of the product Description-Function?
Q: Yes, the product's Description-Function is indeed Evaluation Module
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is BUF08630.