CDCEL949PERF-EVM

Mfr. #: CDCEL949PERF-EVM
メーカー: Texas Instruments
説明: EVAL MOD PERFORMANCE FOR CDCE949
ライフサイクル: メーカー新製品
データシート: CDCEL949PERF-EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCEL949PERF-EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Synthesizers This product's 230 MHz range is 0Hz to 2.2GHz. The Timing, Clock Generator is the Main-Purpose. Primary-Attributes: - IC package type: CDCEL949PERF This product operates at a 1.8 V supply voltage for reliable performance. This tool is designed for the CDCEL949. USB interface type

CDCEL949PERF-EVM Image

CDCEL949PERF-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCEL949PERF-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Synthesizers
  • Frequency 230 MHz
  • Main-Purpose Timing, Clock Generator
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part CDCEL949PERF
  • Operating-Supply-Voltage 1.8 V
  • Tool-Is-For-Evaluation-Of CDCEL949
  • Interface-Type USB

CDCEL949PERF-EVM

CDCEL949PERF-EVM Specifications

CDCEL949PERF-EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Synthesizers

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 230 MHz.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Clock Generator.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed CDCEL949PERF

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is CDCEL949.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$172.52
$172.52
10
$163.89
$1 638.89
100
$155.26
$15 526.35
500
$146.64
$73 318.90
1000
$138.01
$138 012.00
Top