CDCLVD1213EVM

Mfr. #: CDCLVD1213EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR CDCLVD1213
ライフサイクル: メーカー新製品
データシート: CDCLVD1213EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVD1213EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Clock Buffers Bulk is the packaging method for this product This product's 800 MHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer is the Main-Purpose. Primary-Attributes: - IC package type: CDCLVD1213 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product operates at a 2.5 V supply voltage for reliable performance. This tool is designed for the CDCLVD1213.

CDCLVD1213EVM Image

CDCLVD1213EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVD1213EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Clock Buffers
  • Packaging Bulk
  • Frequency 800 MHz
  • Main-Purpose Timing, Clock Buffer
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDCLVD1213
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 2.5 V
  • Tool-Is-For-Evaluation-Of CDCLVD1213

CDCLVD1213EVM

CDCLVD1213EVM Specifications

CDCLVD1213EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Buffers

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 800 MHz

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Timing, Clock Buffer

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCLVD1213.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 85 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 40 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.5 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDCLVD1213.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$172.52
$172.52
10
$163.89
$1 638.89
100
$155.26
$15 526.35
500
$146.64
$73 318.90
1000
$138.01
$138 012.00
Top