CDCLVP1102EVM

Mfr. #: CDCLVP1102EVM
メーカー: Texas Instruments
説明: EVALUATION MODULE FOR CDCLVP1102
ライフサイクル: メーカー新製品
データシート: CDCLVP1102EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVP1102EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Buffers Bulk is the packaging method for this product This product's 200 MHz 2 GHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer / Driver / Receiver / Translator is the Main-Purpose. Primary-Attributes: - IC package type: CDCLVP1102 This product operates at a 2.375 V to 3.6 V supply voltage for reliable performance. This tool is designed for the CDCLVP1102.

CDCLVP1102EVM Image

CDCLVP1102EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVP1102EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Buffers
  • Packaging Bulk
  • Frequency 200 MHz 2 GHz
  • Main-Purpose Timing, Clock Buffer / Driver / Receiver / Translator
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDCLVP1102
  • Operating-Supply-Voltage 2.375 V to 3.6 V
  • Tool-Is-For-Evaluation-Of CDCLVP1102

CDCLVP1102EVM

CDCLVP1102EVM Specifications

CDCLVP1102EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Buffers

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 200 MHz 2 GHz

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Timing, Clock Buffer / Driver / Receiver / Translator

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCLVP1102.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.375 V to 3.6 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDCLVP1102.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$28.64
$28.64
10
$27.20
$272.03
100
$25.77
$2 577.15
500
$24.34
$12 169.90
1000
$22.91
$22 908.00
Top