DAC3164EVM

Mfr. #: DAC3164EVM
メーカー: Texas Instruments
説明: EVAL BOARD FOR DAC3164
ライフサイクル: メーカー新製品
データシート: DAC3164EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC3164EVM Overview

Product belongs to the DAC3164 series. This product is categorized as Evaluation Modules Type: DAC Bulk is the packaging method for this product This product is designed DAC31x4 amplifier. This product is an DAC3164 12 Bit 500M Samples Per Second Digital to Analog Converter (DAC) Evaluation Board. This tool is designed for the DAC31x4. 20 mA is 92 nA. GUI interface type

DAC3164EVM Image

DAC3164EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC3164EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series DAC3164
  • Product Evaluation Modules
  • Type DAC
  • Packaging Bulk
  • For-Use-With DAC31x4
  • Description-Function DAC3164 12 Bit 500M Samples Per Second Digital to Analog Converter (DAC) Evaluation Board
  • Tool-Is-For-Evaluation-Of DAC31x4
  • Operating-Supply-Current 20 mA
  • Interface-Type GUI

DAC3164EVM

DAC3164EVM Specifications

DAC3164EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DAC3164.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is DAC31x4.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is DAC3164 12 Bit 500M Samples Per Second Digital to Analog Converter (DAC) Evaluation Board.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC31x4

  • A: What is the Operating-Supply-Current of the product?

    Q: The Operating-Supply-Current of the product is 20 mA.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed GUI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$95.90
$95.90
10
$91.10
$911.00
100
$86.31
$8 630.55
500
$81.51
$40 755.40
1000
$76.72
$76 716.00
Top