DAC8551EVM

Mfr. #: DAC8551EVM
メーカー: Texas Instruments
説明: EVALUATION MODULE FOR DAC8551
ライフサイクル: メーカー新製品
データシート: DAC8551EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8551EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8551. SPI interface type

DAC8551EVM Image

DAC8551EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8551EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8551
  • Interface-Type SPI

DAC8551EVM

DAC8551EVM Specifications

DAC8551EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC8551.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$73.50
$73.50
10
$69.82
$698.25
100
$66.15
$6 615.00
500
$62.48
$31 237.50
1000
$58.80
$58 800.00
Top