DAC8552EVM

Mfr. #: DAC8552EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR DAC8552
ライフサイクル: メーカー新製品
データシート: DAC8552EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8552EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8552. SPI interface type

DAC8552EVM Image

DAC8552EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8552EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8552
  • Interface-Type SPI

DAC8552EVM

DAC8552EVM Specifications

DAC8552EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC8552

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$76.10
$76.10
10
$72.29
$722.90
100
$68.49
$6 848.55
500
$64.68
$32 340.40
1000
$60.88
$60 876.00
Top