DAC8728EVM

Mfr. #: DAC8728EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR DAC8728
ライフサイクル: メーカー新製品
データシート: DAC8728EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8728EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8728.

DAC8728EVM Image

DAC8728EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8728EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8728

DAC8728EVM

DAC8728EVM Specifications

DAC8728EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V to 5 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC8728.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$114.63
$114.63
10
$108.90
$1 088.98
100
$103.17
$10 316.70
500
$97.44
$48 717.75
1000
$91.70
$91 704.00
Top