DAC8734EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8734. SPI interface type

DAC8734EVM Image

DAC8734EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8734EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8734
  • Interface-Type SPI

DAC8734EVM

DAC8734EVM Specifications

DAC8734EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC8734.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00