DAC8760EVM

Mfr. #: DAC8760EVM
メーカー: Texas Instruments
説明: EVAL BOARD 16BIT DAC
ライフサイクル: メーカー新製品
データシート: DAC8760EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8760EVM Overview

Product belongs to the DAC8760 series. This product is categorized as Evaluation Kits Type: DAC Bulk is the packaging method for this product This product is designed DAC8760 amplifier. This product is an Complete evaluation kit that includes a USB-based motherboard and software. This tool is designed for the DAC8760. USB interface type

DAC8760EVM Image

DAC8760EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8760EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series DAC8760
  • Product Evaluation Kits
  • Type DAC
  • Packaging Bulk
  • For-Use-With DAC8760
  • Description-Function Complete evaluation kit that includes a USB-based motherboard and software
  • Tool-Is-For-Evaluation-Of DAC8760
  • Interface-Type USB

DAC8760EVM

DAC8760EVM Specifications

DAC8760EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is DAC8760.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DAC8760.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Complete evaluation kit that includes a USB-based motherboard and software.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC8760.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$212.23
$212.23
10
$201.62
$2 016.20
100
$191.01
$19 100.84
500
$180.40
$90 198.40
1000
$169.79
$169 785.20
Top