| Mfr. #: | DRV110EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVAL MODULE FOR DRV110 |
| ライフサイクル: | メーカー新製品 |
| データシート: | DRV110EVM データシート |


Product belongs to the DRV110 series. This product is categorized as Evaluation Modules Type: Current Mode PWM Controllers Bulk is the packaging method for this product This product is designed DRV110 DRV120 amplifier. The Power Management, Solenoid Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV110 Maximum operating temperature of + 35 C Minimum operating temperature: - 40 C This product is an DRV110A 14-pin TSSOP. This tool is designed for the DRV110 DRV120. Input Voltage Range: 7 V to 48 V 100 V to 240 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV110EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed DRV110
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Current Mode PWM Controllers
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: At what frequency does the For-Use-With?
Q: The product For-Use-With is DRV110 DRV120.
A: Is the cutoff frequency of the product Main-Purpose?
Q: Yes, the product's Main-Purpose is indeed Power Management, Solenoid Control
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is -.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is DRV110.
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 35 C.
A: Is the cutoff frequency of the product Minimum-Operating-Temperature?
Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C
A: What is the Description-Function of the product?
Q: The Description-Function of the product is DRV110A 14-pin TSSOP.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV110 DRV120
A: What is the Input-Voltage of the product?
Q: The Input-Voltage of the product is 7 V to 48 V 100 V to 240 V.