DRV3201EVM

Mfr. #: DRV3201EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR DRV3201
ライフサイクル: メーカー新製品
データシート: DRV3201EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV3201EVM Overview

Product belongs to the DRV3201 series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV3201 Output voltage: 3.3 V 5 V This product is an Evaluates the operation and performance of the DRV3201-Q1 bridge driver. This tool is designed for the DRV3201-Q1. CAN JTAG LIN SPI USB interface type Input Voltage Range: 4.75 V to 30 V Output current: 400 mA 2.5 A

DRV3201EVM Image

DRV3201EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV3201EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV3201
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part DRV3201
  • Output-Voltage 3.3 V 5 V
  • Description-Function Evaluates the operation and performance of the DRV3201-Q1 bridge driver
  • Tool-Is-For-Evaluation-Of DRV3201-Q1
  • Interface-Type CAN JTAG LIN SPI USB
  • Input-Voltage 4.75 V to 30 V
  • Output-Current 400 mA 2.5 A

DRV3201EVM

DRV3201EVM Specifications

DRV3201EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DRV3201.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV3201

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 3.3 V 5 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Evaluates the operation and performance of the DRV3201-Q1 bridge driver.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV3201-Q1.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed CAN JTAG LIN SPI USB

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 4.75 V to 30 V

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 400 mA 2.5 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$774.93
$774.93
10
$736.18
$7 361.84
100
$697.44
$69 743.70
500
$658.69
$329 345.25
1000
$619.94
$619 944.00
Top