DRV3204EVM

Mfr. #: DRV3204EVM
メーカー: Texas Instruments
説明: EVAL MODULE FOR DRV3204
ライフサイクル: メーカー新製品
データシート: DRV3204EVM データシート
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV3204EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers This product is designed DRV3204-Q1 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: 3-Ph Brushless DC (BLDC) Motors IC package type: DRV3204 This product is an An application board to evaluate the DRV3204-Q1. This tool is designed for the DRV3204-Q1. SPI interface type Input Voltage Range: 12 V Output current: 10 A

DRV3204EVM Image

DRV3204EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV3204EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • For-Use-With DRV3204-Q1
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes 3-Ph Brushless DC (BLDC) Motors
  • Embedded -
  • Utilized-IC-Part DRV3204
  • Description-Function An application board to evaluate the DRV3204-Q1
  • Tool-Is-For-Evaluation-Of DRV3204-Q1
  • Interface-Type SPI
  • Input-Voltage 12 V
  • Output-Current 10 A

DRV3204EVM

DRV3204EVM Specifications

DRV3204EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DRV3204-Q1.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 3-Ph Brushless DC (BLDC) Motors

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV3204

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed An application board to evaluate the DRV3204-Q1

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV3204-Q1.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 12 V.

  • A: What is the Output-Current of the product?

    Q: The Output-Current of the product is 10 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
単価
小計金額
1
$1.00
$1.00
10
$957.47
$9 574.72
100
$907.08
$90 707.85
500
$856.69
$428 342.65
1000
$806.29
$806 292.00
Top