| Mfr. #: | DRV591EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVAL MOD FOR DRV591 |
| ライフサイクル: | メーカー新製品 |
| データシート: | DRV591EVM データシート |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Gate Drivers Bulk is the packaging method for this product The Power Management, Half H-Bridge Driver (Internal FET) is the Main-Purpose. Primary-Attributes: +/-3A, 2.8 ~ 5.5V, Driver for Thermoelectric Cooler (TEC) or Laser Diode IC package type: DRV591 This tool is designed for the DRV591VFP. Input Voltage Range: 2.8 V to 5.5 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV591EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Gate Drivers.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Power Management, Half H-Bridge Driver (Internal FET).
A: Is the cutoff frequency of the product Primary-Attributes?
Q: Yes, the product's Primary-Attributes is indeed +/-3A, 2.8 ~ 5.5V, Driver for Thermoelectric Cooler (TEC) or Laser Diode
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is DRV591.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV591VFP
A: At what frequency does the Input-Voltage?
Q: The product Input-Voltage is 2.8 V to 5.5 V.