| Mfr. #: | DRV601EVM |
|---|---|
| メーカー: | Texas Instruments |
| 説明: | EVAL MODULE FOR DRV601 |
| ライフサイクル: | メーカー新製品 |
| データシート: | DRV601EVM データシート |


Product belongs to the DirectPath series. Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 1.8 V ~ 4.5 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV601 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV601.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV601EVM Specifications
A: At what frequency does the Series?
Q: The product Series is DirectPath.
A: At what frequency does the Type?
Q: The product Type is Audio Amplifiers.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: What is the Output-Type of the product?
Q: The Output-Type of the product is 2-Channel (Stereo).
A: Is the cutoff frequency of the product Voltage-Supply?
Q: Yes, the product's Voltage-Supply is indeed 1.8 V ~ 4.5 V
A: Is the cutoff frequency of the product Max-Output-Power-x-Channels-Load?
Q: Yes, the product's Max-Output-Power-x-Channels-Load is indeed -
A: What is the Amplifier-Type of the product?
Q: The Amplifier-Type of the product is Class AB.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed DRV601
A: At what frequency does the Board-Type?
Q: The product Board-Type is Fully Populated.
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV601